Course Objectives:
This course enables the students to
Course Outcomes(COs):
Learning outcomes (at course level) | Learning and teaching strategies | Assessment Strategies |
CO259. Identify skills and capabilities that intersect effectively with the needs of industry.
CO260. Apply and practice good communication skills in the workplace setting.
CO261. Align the project to the organization's strategic plans and business justification throughout its lifecycle.
CO262. Utilize technology tools for communication, collaboration, information management, and decision support
CO263. Adapt project management practices to meet the needs of stakeholders from multiple sectors of the economy (i.e. consulting, government, arts, media, and charity organizations)
CO264. Reflect and evaluate on experiences that might lead to future employment. | Approach in teaching: Project Designing using Modular Approach, Form Design, Database Design, Presentation, Project Report
Learning activities for the students: Self-Learning Assignments, Converting specifications to Code, Innovative Solutions | Internal Assessment Synopsis Software Requirement & Design Specification Mid-Term Assessment Report Project Presentation Project Report
Semester End Assessment: Project Demo Project Presentation Project Report Viva-voce Adherence to Specifications System Knowledge and Understanding Innovation and Originality |
Contents
Project Report Formulation:
The project report should contain the following:
· Original copy of the Approved Performa and Project Proposal.
· Bio-data of the guide with her/his signature and date.
· Certificate of Originality (Format given).
· Project documentation.
A CD consisting of the executable file(s) of the complete project should be attached on the last page of the project report. In no case, it should be sent separately. The student needs to retain the identical copy of the CD that should be carried while appearing for the viva-voce along with the project report.
Project Documentation:
Two copies of the original project report in the bound form along with the CD (containing the executable file(s) of the project should be enclosed in the last page) is to be prepared at the time of final viva. One copy of the same Project Report and the CD containing the executable file(s) shall be retained by the student, which should be produced before the examiner at the time of viva-voce
MANUAL FOR PREPARATION OF MCA Project (Prescribed Format and Specification)
Essential Components of Project Report
a. Title Page
b. Certificate from Company
c. Certificate from Guide
d. Acknowledgement
e. Index with printed Page Numbers
CHAPTER 1 : INTRODUCTION
1.1 Company/Educational Institute Profile
1.2 Existing System and Need for System
1.3 Scope of Work
1.4 Operating Environment – Hardware and Software
CHAPTER 2: PROPOSED SYSTEM
2.1 Proposed System
2.2 Objectives of System
2.3 User Requirements
CHAPTER 3: ANALYSIS & DESIGN
3.1 Entity Relationship Diagram (ERD)
3.2 System Architecture
3.3 Database Requirements & User Interfaces
3.4 Data Flow Diagram (DFD)
3.5 Data Dictionary
3.6 Table Design
3.7 Code Design
3.6 Menu Screens
3.7 Input Screens
3.8 Report Formats
3.9 Test Procedures and Implementation
CHAPTER 4: User Manual
4.1 User Manual
4.2 Operations Manual / Menu Explanation
4.3 Forms and Report Specifications
Drawbacks and Limitations
Proposed Enhancements
Conclusions
Bibliography
Annexure:
Annexure 1: Input Forms with data
Annexure 2: Output Reports with Data
Annexure 3: Sample Code